BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Electrical Contractors Association of Ontario - ECPv6.15.9//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Electrical Contractors Association of Ontario
X-ORIGINAL-URL:https://www.ecao.org
X-WR-CALDESC:Events for Electrical Contractors Association of Ontario
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Toronto
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Toronto:20250903T100000
DTEND;TZID=America/Toronto:20250903T110000
DTSTAMP:20260408T134820
CREATED:20250625T154232Z
LAST-MODIFIED:20250731T182344Z
UID:10000039-1756893600-1756897200@www.ecao.org
SUMMARY:Fault-Managed Power Systems: The Future of Safe\, High-Efficiency DC Distribution (Webinar)
DESCRIPTION:Presented by Bolis Ibrahim\nPresident at Cence Power\, Inc. \nThe shift toward DC power distribution is transforming modern buildings\, telecom\, and data centers—but safety and efficiency remain critical challenges. Electrical contractors today face growing demands for higher-voltage DC systems without compromising reliability or code compliance. \nJoin us for an in-depth webinar exploring how fault-managed power systems provide a smarter\, safer way to deliver DC power. Attendees will gain actionable insights into: \n\nDC power distribution versus AC power distribution (under 600 V)\n\nThe shift toward DC loads: Why modern buildings are already largely DC on the inside\n\n\nClass 2\, low-voltage distribution (up to 60 V\, 100 W)\n\nCentralized versus decentralized AC-to-DC power conversion\nLighting case study\n\nUL 2108 “Low-voltage lighting systems”\nUL 916 “Energy management equipment”\n\n\n\n\nClass 4 fault-managed power systems (up to 450 VDC)\n\nApplications: telecom and data centres\nElectrical code and safety certifications\n\nNEC Article 726 “Class 4 fault-managed power systems”\nCSA Standards (coming soon)\nUL 1400-1 “Outline of investigation for fault-managed power systems\, Part 1: safety requirements” and UL 1400-2 “Outline of investigation for fault-managed power systems\, Part 2: requirements for cables”\n\n\n\n\n\n📅 WHEN: September 3\, 2025 | 🕘 10:00 AM – 11:00 AM (EST) \n📍 WHERE: Virtual \n🔗 Register on Zoom or by logging in to ECAO’s Learning Centre.
URL:https://www.ecao.org/event-calendar/fault-managed-power-fmp-webinar/
CATEGORIES:Webinar
LOCATION:
END:VEVENT
END:VCALENDAR